2018 Tram maintenance

2018 Tram maintenance

Credit: OHSU News

A construction worker walks about 125' up, atop the Portland Aerial Tram lines, part of a 5-week track line maintenance operation, July 2, 2018. Every 12 years the ropes must be shifted. Each line holds about 124,000 pounds of tension. The tram will reopen on July 30. (OHSU/Kristyna Wentz-Graff)

Download Photo (4.9 MB)